Given many difficulties in the application of supports and hangers in the installation and application scenarios of typical equipment and machine rooms represented by the construction of airports and subways, Faust proposed the solution of het heavy support and hanger system.
Perfect solution for
(1) Safety hazards: Safety hazards in the construction process and later in the operation and maintenance
(2) Space utilization: the space is optimized in depth by BIM in the early stages and is not affected by space in the later stages through building block installation
(3) Time utilization: reduced production time and increased installation efficiency
(4) Aesthetic consistency
(5) Environmental impact
(6) Maintenance cost
Faust FTA embedded channel steel is easy to adjust and time-saving in installation
speed up construction progress and save construction costs.
There are various forms and materials of embedded channel steel in Faust FTA
The common channel is used together with the toothed T-bolt, with stable and reliable performance;
Carbon steel and stainless steel materials can be selected by customers.
Thermal conductivity 0.05
No water absorption, no mildew, (extreme) high temperature and low-temperature resistance
Fire rating: flame retardant
Gas foaming technology using non-destructive ozone layer
Long service life, maintenance-free for more than 30 years
The rear belled anchor bolt has hexagonal nuts and provides excellent performance on cracked and non-cracked concrete. In addition, it can be used for seismic fastening and the use of the Faust seismic system. This heavy-duty anchor bolt is grade 8.8 high-strength steel and can be used in small edge distance and small spacing applications.
BIM contains complete information such as design, construction, maintenance and association based on the three-dimensional model of the project. It is a modern tool applied to the management of each stage of the life cycle of the construction project. It helps all parties involved in the project better understand the design concept, improve efficiency, reduce errors, save costs, shorten the construction period, enhance the project safety and management ability, and ensure the benign operation and continuous optimization of relevant businesses in the project.
According to the Research Report of PricewaterhouseCoopers, the application of BIM can shorten the overall cycle of the construction project by 5%, which the communication time can be saved by 30% ~ 60%, the information search time can be saved by 50%, and the cost can be reduced by 5%. It can significantly speed up the project information exchange process and save the project cost.